Our News

Training Facility in Double Quick Time

The client, a pharmaceutical company, required the installation of a training facility within its existing factory premises.

 

The design used a proprietary steel framing system (SFS) provided by Hadley Group, providing a series of structural sections. This means the walls of the new training rooms are self supporting, allowing continued access as required to the existing building envelope. The design, incorporating a steel frame system for the floor of the new facility, also allows for the spreading of loads to suit the needs of the new structure and the fabric of the existing building.

Take a look at our news articles
View News Page

reviews

Customer Satisfaction

    
Arriva Trains

A job well done, playing a key part of the railway upgrade plains in South Wales

    
Nathaniels Bridgend

A fitting interior to promote the growing MG brand in South Wales.

default image
    
Steve Cox

SDL managed a complex installation efficiently, creating us high spec new facilities within an existing factory building.

default image
    
John Dowell

We demanded a high standard of fit and finish, and SDL did not disappoint.

default image
    
Regus

SDL has completed fit-outs to a number of Regus Centres and is on the company's list of preferred contractors.

default image
    
Fredric Linder – KNIM

Work packages were completed efficiently, and the working environment in our new offices on site is first class.

Prev
Next